
Category The Rig


Main Boom Details
Details of the after end of the main boom including the rigging of the main sheet, and the outhaul.

Jib Boom Details
Details of the after end of the jib boom including the jib sheet rigging to the deck fairlead, the jib outhaul, and the topping lift.

Boom Vang Details
Details of the boom vang attachment to the mast and the main boom.

Jib Attachment Details
Details of the area where the jib attaches to the mast including the jibstay attachment, the jib halyard, mast tangs, and upper shroud attachment.

Front of Jib Details
Details of the front of the jib boom including the jib club fitting attachment for the jibstay and jib tack and the jib swivel attachment to the jib rack.

Main Boom Attachment Details
Details of the attachment of the main boom to the mast including the gooseneck fitting, the downhaul, and the boom vang.

Deck Fairlead Details
Details of the connection of the sheets (jib sheet and main sheet) to the sheet line that comes up through the deck fairlead.

Mast Step Detail
Details of the connection of the mast to a simple on-deck mast step.
