Assembling the Rig

The articles about assembling the rig are meant to be read and the steps followed in order: first asseembling your booms through final assembly.

Make sure you have all of the hardware you will need and all of the sub-assemblies made before you get started

Assembly Checklist

Boom Assembly

Mast Assembly

Final Assembly

Assembly Articles

  1. Assembling a Jib and Main Boom. usvmyg.org. June 2026.
    • The step-by-step process for shaping and installing fittings on your main and jib booms to prepare for final assembly of the rig.
  2. Assembling the Mast.” usvmyg.org. June 2026.
    • The step-by-step process for sizing and shaping your mast and installing the mast fittings including the optional Jenny stay strut.
  3. Mast Assembly Drawing.” usvmyg.org. June 2026.
    • A complete reference drawing of mast assembly including positions of all of the hardware and fittings.
  4. The Rig Final Assembly.” usvmyg.org. July 2026.
    • The step-by-step process for bringing together the assembled mast and booms from earlier articles and bending on the sails.
  5. Finishing Touches” usvmyg.org. July 2026.
    • Add battens, class insignia, sail numbers, and telltales to your rig.
  6. Installing the Rig.” usvmyg.org. July 2026.
    • This article describes how to mount the rig on the hull so that it is straight.